Create Your First Project
Start adding your projects to your portfolio. Click on "Manage Projects" to get started
MURANGA PETROL STATION
Project type
PETROL STATION
Date
MAY 2022 - NOW
Location
MUKUYU, MURANGA
Project Overview: Petrol Station Renovation and Expansion
Project Objective
The project aims to revitalize an existing petrol station by renovating its current buildings and adding new structures to enhance functionality, aesthetics, and customer experience. The design will integrate a modern restaurant on the ground floor, accommodation rooms on the upper levels, a new service bay, and a contemporary three-pillar canopy, while also updating the tank farm.
Key Components
Renovation of Existing Buildings
Facade Update: A complete facelift of the existing buildings with modern materials such as glass, steel, and sustainable cladding to improve aesthetics and energy efficiency.
Interior Redesign: Modernized interiors featuring improved layout and facilities, with a focus on creating a welcoming atmosphere.
Restaurant Space: The ground floor will be transformed into a vibrant restaurant with a spacious dining area, open kitchen, and outdoor seating. The design will emphasize natural light and a warm, inviting ambiance.
Accommodation Rooms
Upper Floors: The first and second floors will be converted into well-designed accommodation rooms, catering to travelers and long-distance drivers. Each room will include:
Modern amenities such as en-suite bathrooms, Wi-Fi, and smart TVs.
A neutral color palette and comfortable furnishings to create a relaxing atmosphere.
Balconies or windows with views of the surrounding area.
New Service Bay
Design and Functionality: A new service bay will be constructed, equipped with advanced automotive servicing equipment. The design will prioritize accessibility and workflow efficiency.
Sustainable Practices: Incorporation of eco-friendly features, such as rainwater harvesting systems and energy-efficient lighting.
New Canopy Structure
Three-Pillar Canopy: A striking new canopy with a modern design, featuring a spacious overhang to protect customers while refueling. The canopy will utilize LED lighting for visibility and safety at night, and could incorporate solar panels for energy efficiency.
Tank Farm
Modernization: The tank farm will be upgraded to comply with the latest safety and environmental standards. New tanks will be installed underground to minimize the visual impact and improve safety.
Design Integration
Harmonious Aesthetic: The design will seamlessly blend the renovated and new elements, using complementary materials, colors, and architectural styles. Landscaping will play a key role, with green spaces and planters to enhance the overall environment.
Customer Flow: Careful attention will be given to the layout to ensure smooth flow for customers moving between the petrol station, restaurant, and accommodation areas.
Sustainability: Green building practices will be employed throughout, from energy-efficient systems to sustainable materials, contributing to a lower carbon footprint.
Conclusion
This petrol station renovation project is not just about updating infrastructure; it aims to create a multifunctional space that serves as a community hub for travelers. By thoughtfully integrating new structures with renovated ones, the project will offer enhanced services while promoting sustainability and customer satisfaction. The final product will be a modern, inviting, and efficient petrol station that stands out in the market.




















